Overview
NOTGATE was commissioned to design and deliver a twin-tower commercial complex on one of Victoria Island's last premium plots. The brief demanded Class-A specifications, LEED-aligned systems, and completion within 18 months.
Project Facts
- Location
- Victoria Island, Lagos
- Client
- Lighthouse Properties Ltd
- Project Type
- Commercial
- Status
- Landmark
- Duration
- 18 Months
- Completion Date
- December 2022
- Services
- Design & Build · Deep Piling · MEP Engineering · Project Management · Interior Fit-Out
- Structural Engineer
- NOTGATE Structural Division
- Architect
- Adeyemi Associates
- Team Size
- 340 workers at peak
The Challenge
The site's proximity to the Lagos lagoon required specialised deep piling — over 1,200 bored piles to bedrock. Coordinating 6 simultaneous subcontractor streams while maintaining schedule demanded NOTGATE's full multi-project management system. Additionally, the client required uninterrupted power systems and a fibre-optic backbone capable of supporting 10,000 concurrent users.
The Solution
NOTGATE deployed its proprietary deep-piling methodology using a combination of continuous flight auger and bored cast-in-situ techniques. A dedicated project war room with real-time drone monitoring and BIM coordination kept all 6 subcontractor streams aligned. A 2.5MVA backup power plant and redundant fibre network were installed to future-proof the towers.
Project Gallery

Project Impact
The towers were handed over ahead of schedule and became 100% tenanted within 4 months of completion. Total delivered value came to ₦12.8B — exceeding projections by 11%.
1,200+
Bored Piles
32
Floors
480
Parking Bays
68
LEED Points
"NOTGATE delivered something that didn't just meet the brief — it surpassed everything we imagined for this site. The quality of finish, the speed of delivery, and the professionalism of the team set a new standard for commercial development in Lagos."
Next Project
Abuja Federal Secretariat Annex