Ibadan Ring Road Bridge

Challenge–Toll Gate, Ibadan·2019·Infrastructure
FIG. 01 — PROJECT HERO
Ibadan Ring Road Bridge

Overview

Construct a 940-metre pre-stressed concrete bridge to link Ibadan's western bypass with the Challenge-Toll Gate corridor, eliminating the need for vehicles to pass through the city centre.

Project Facts

Location
Challenge–Toll Gate, Ibadan
Client
Oyo State Ministry of Works
Project Type
Infrastructure
Status
Completed
Duration
11 Months
Completion Date
September 2019
Services
Civil Engineering · Pre-stressed Concrete · Incremental Launching · Caisson Foundations · Road Surfacing
Structural Engineer
NOTGATE Civil & Structural
Team Size
140 workers at peak

The Challenge

The bridge had to span a major river and existing road intersection with minimal disruption. Pre-stressed concrete requires precise tensioning and curing — any error compromises the entire structure. The state also required that the existing road remain open throughout construction.

The Solution

NOTGATE used incremental launching for the bridge deck, pushing segments across from one abutment while maintaining traffic below. Pre-stressing cables were tensioned using computer-controlled jacks to ensure uniform force distribution. The river piers were founded on caissons sunk through 12 metres of alluvium to bedrock.

Project Gallery

Ibadan Ring Road Bridge — view 1

Project Impact

The bridge reduced inner-city transit time by 35% and has handled over 50 million vehicle crossings with zero structural issues. It won the Nigerian Society of Engineers' 'Infrastructure Project of the Year 2019'. 35% transit time reduction.

940m

Span

50M+

Vehicle Crossings

35%

Transit Reduction

NSE 2019

Award

"NOTGATE built us a bridge that has transformed Ibadan's traffic flow. Their incremental launching technique kept the road open and the quality is outstanding."

Commissioner for WorksOyo State Government